Contracts with public administrations and private companies

PT: Project Title//FA: Funding Agency

TP: Initial and general characterization of pesticides used in water masses in poor condition by pesticides from the community of Castilla-La Mancha, with special emphasis on the surface water body called 18.14.01.06 (Canal de Mª Cristina)
PT: Jucar River Basin Authority-TRAGSATEC.
Duration: from september 2016 to september 2017

PT: Update and extension of the Aquifer System 08-29 groundwater flow model (II)
FA: Jucar River Basin Authority-TRAGSATEC.
Duration: from 02/08/2013 to 02/08/2014

PT: Update and extension of the Aquifer System 08-29 groundwater flow model (I)
FA: Jucar River Basin Authority-TRAGSATEC.
Duration: from 06/05/2011 to 31/12/2012

PT: Evaluation of the wastewaters impact on the Pétrola lake hydrochemistry
FA: Ibersilva Servicios SAU.
Duration: from 01/05/2010 to 31/01/2011

PT: Study of the ecological status of the rivers of Castilla-La Mancha and determination of ecological flows in river sections of regional interest
FA: Aguas de Castilla-La Mancha.
Duration: from 19/07/2010 to 31/06/2010

PT: Realization of a  groundwater flow model of the Aquifer System 08-29 (Mancha Oriental).
FA: Jucar River Basin Authority-TRAGSATEC.
Duration: from 2009 to  2010

PT Groundwater quality for urban water supply in the Salobral-Los Llanos Domain (Mancha Oriental System)
FA: Ayuntamiento de Albacete (Albacete City Council).
Duration: from May 2008 to december 2010